Sunday, 31 May 2009

Hooray finally an update!

Right what has happened in the last 3 months....

We have finally finished all the wiring, just got the sockets to put on downstairs and fit the underfloor heating.

We had a slight drama with the underfloor heating in the bathroom with the sensor probe not working. It had been tested and ok'd but after we had tiled (typical) it decided it didn't want to work anymore. We had thought it could have been the heating wire itself but thank god it wasn't otherwise we would have had to take up all the tiles! As it was only the probe we just had to lift one tile. This itself was a total pain as it wouldn't lift as a whole and so we had to chip it away bit by bit to avoid damaging the cable underneath! We have now replaced the probe and its all working fine! Just got to lay a new tile.

The plastering is all finished and we have started decorating. All downstairs has been mist coated and the living room and pantry finished:




Its a bit difficult to see the colours but the chimney breast in the livingroom is a whitish cream (Crown - Winterbloom) and the walls are a mushroom colour (Crown - Wheatgrass).

We also painted the pantry winterbloom to keep it light as its a small space!

We have also dug out under the stairs as once we had taken the wall down we realised it was damp. So we have put in a new damp proof membrane and put in brick supports for the new joists. We are also having to replace part of a joist and a lot of the floorboards due to dry rot!



I was expecting loads of rubbish to be under the floorboards but it wasn't too bad just needed a bit of clearing and a good hoover. (The dodgy pipework is no longer connected and we are going to remove it).

Once we have put floorboards back down and under the stairs we can lay the underfloor heating and get the wooden floor down! I cant wait for this as it will make a huge difference!

Next few jobs are to get the plumber back to service the boiler so we can have hot water, lay the flooring downstairs, fix the skirting and architrave, carpet upstairs, fit kitchen and finish bathroom...move in!

Wednesday, 4 March 2009

Bathroom Floor Tiled - 3rd March 2009

Stuart has laid and grouted the tiles on the bathroom floor! They look so lovely, a prett good job for a first timer!

The wall tiles will hopefully be done this weekend coming!

Monday, 23 February 2009

Boarded Hall & Landing - 21st/22nd Feb 09

The hall and landing is boarded and is looking so much better! We spoke to the plasterers and they said we should knock down the wall as its serving no purpose. They said we could either leave it open or they could stud and board it.

Once we had knocked it down, we decided to leave it that way as it made the hall so much bigger! Only problem now is that there is no damp proof membrane! It looks like it used to be a coal house under the stairs as there is a door that has been blocked up. We dug up the concrete and found rubble and then soil. We are going to dig it down to the foundations and put in new joist supports so we can lay floorboards straight across. Where the original floorboards met the soil they have become rotten so need replacing anyway! Another little job we were not expecting!





Still carrying on with the electrics, adding an extra socket under the stairs now so that was a bit of extra work for my Dad!

Should have the electrics finished this week and the plasterers will have skimmed the hall by Thursday! One room left to go then we can start making it look pretty!

Understairs problem - 15th Feb 2009

Not a lot to report as the work we have been doing isn't very visual. We've been carrying on with the electrics, almost there!

The wall under the stairs is very unstable, luckily it doesn't support the stairs! Stuart had a go at taking a few bricks out and building it back up. He did a good job but it still wasn't very stable! Will have to have a word with the plasterers and see if it will board ok!



The plasterers have started to board the hall and landing! Its getting there!

Friday, 6 February 2009

We now have a working fire and its beautiful! - 6th Feb 2009

Today the plumber returned to commission the fire. As its quite a biggy we had to have an air vent installed. I hope it doesn't make the house drafty!

Its so lovely, I took a video of it in action!




Being in the house is going to be much nicer now we have some heat! We now have light and heat so no excuses for not getting lots of jobs done this weekend!

Monday, 2 February 2009

More lighting and plastering done - 31st Jan 2009

Got lots more done this weekend! We got the lighting upstairs finished, the living room plastered, plaster knocked off walls, front bedroom almost painted with the first coat and a good tidy up! It wore me out!

I'm quite pleased I got snowed in today so I can have a rest ha ha!

One little problem was that we bought these ace electronic dimmer light switches from wickes for the bedrooms but they don't work. One doesn't at all and the other just turns on or off, no dimming! Will have to take them back and swap them!

All in all a productive weekend! Next weekend the hall will be done then the week after the kitchen/diner. Its all starting to come together! Yey!

Friday, 30 January 2009

Insulation is in and the plasterers are at work - 30th Jan 2009

Spent the day getting the living room ready for the plasterers coming later today.

Got the earth bonding finished, a light put in under the stairs and the insulation put in the living room ceiling. Also had to knock the plaster of the chimney breast so that the fire could be boarded in properly. The plumber hadn't left quite enough room when he installed it. It took ages to clear up the mess!



They are there at the minute boarding the ceiling, bless them it must be freezing! I have left them a heater but I don't think it will help that much!